Need Help with Pexto Power Shear Interlock install

Specifically: Need to move where the Ethernet drop comes out of the ceiling a few tiles. As it is positioned now, cuttings will fall on the cable as it’s set up right now. Need to move it to the interlock side of the machine (on your right as you are facing the machine.)

It’s 5 minutes of ladder work, maybe 10 if you include fetching and returning the ladder. I’m banned from ladders otherwise I’d do it.

When will you be in next? I’m not banned from ladders yet

3 Likes

I plan to be in this afternoon/evening, and Wednesday afternoon/evening.

I don’t have to be there, I can send a marked up photo.

Thanks in advance.

I’ll come by today at 6, and use the photo as reference if I don’t see you.

1 Like