Specifically: Need to move where the Ethernet drop comes out of the ceiling a few tiles. As it is positioned now, cuttings will fall on the cable as it’s set up right now. Need to move it to the interlock side of the machine (on your right as you are facing the machine.)
It’s 5 minutes of ladder work, maybe 10 if you include fetching and returning the ladder. I’m banned from ladders otherwise I’d do it.