Committees were asked to mock up, and in case you missed it every other committee over there has blue tape and cardboard, not steel taken from Infrastructure (which by the way, we found out you cut up some to make the shelving for those jack stands without permission from Infrastructure. That cable ladder is needed for expansion)
You no committee has needed to stand up a bunch of steel for their designs to send to expansion
It doesn’t matter if there were a few openings for the fire alarm crew, they have a large rolling personnel lift that needs to move around the floor to perform the wiring. This is why it all needed to be moved.
Edit: don’t forget CAD software. We have the measurements for all the areas already