Jim, Tim and all
I meet some of you at the last cleaning day and I volunteered to replace some lights. I am available for 2 or 3 hours this weekend to install the new lights. If we have the materials on site please let me know and I will come down and knock out as many as I can, I just need to know a few things:
-location of new lights/materials?
-confirm we are removing old florescent lights/components (including ballasts) and installing LED lights?
-disposition of residue as some contain hazards materials
-onsite availability of ladder/lift and location?
I am also donating an air needler to make de-slagging the support slates on the CNC plasma table easier.
Thanks and standing bye
We’re currently still waiting for the next bulb batch (it’s piggy backing on expansion orders)
Yup
Disposal will be a box provided with the new bulbs; it is prelabled to ship off to a disposal facility
By the freebie shelf / workshop entrance there is the ladder home.
Neat
ok, I will standby until you let me know the new bulbs are in.
Jim - correct me if I misunderstood the plans, but for clarification - we’re rewiring the existing fixtures to bypass the ballast. We’re not replacing the entire fixtures. Right?
Correct
and then some
I had also volunteered for lighting crew when supplies arrive.
Sorry for confusion, I too understand that just florescent bulbs/components come out and LED/components go in to existing fixtures. Covers to be replaced when available…
I wasn’t trying to be a pill. I just want to clarify what you’re volunteering for … replacing the entire troffer may be a different skill set than rewiring the fixture.
Thanks so much for volunteering to do this!