Contractors will be on site tomorrow (Friday the 10th) to install the new roof-top Air Conditioner that cools the Wood Shop area. A construction craine will be in the back parking lot, due to arrive around noon time. Please do not park in the back lot during this time.
Pinned until next week, because it won’t let me differentiate between “tomorrow” and “next week”. Please remind us to pull it down if we forget.
Thank you for doing this!