The front section of the electrical will be done next week. We need help assembling the drop cables for each department.
We need people to cut cable, strip wires, and do assembly.
See Rich Meyer or David Ratcliff for the parts and instructions.
The sooner this is done the sooner we have full use of glass, printmaking, vector, science, electronics and 3d fab.
9 Likes
I’ll be there tomorrow evening and can help. Where can I find Rich or David?
@richmeyer @Tron here on talk. At the space David is usually in science and Rich will be around the expansion office in the common room.
If rich isn’t in the office his number is on the front door for contractors.
1 Like
dryad2b
4
Do you want me to send you Rich’s number via PM? He usually goes home around 4-ish unless he’s got a meeting.
1 Like