Expansion 1.5 kicking off

Hey guys
Expansion is about to kickoff next week for Auto/lathe room/front hallway. As some of you have noticed, we have already started staging down all the items in 102 warehouse. We will be moving this stuff into a trailer one we receive it. Once construction begins Monday/Tuesday we will need to stay out of the contractors way.

No bringing your vehicle into the back, no bringing in junk into the back & leaving it.

7 Likes

At some point do we need to cover equipment to mitigate drywall dust, etc.?

2 Likes

Best I recall, they are going to be putting up a zip wall. Probably wont be a bad idea when that time comes to cover the equipment anyway.

2 Likes

Digital Media/Visual Arts already has plastic-wrapped all their stuff.

1 Like

RDRC has some people here to start duct work. I opened 102 overhead door. Any directions for them.

Call me at
817
*
296
+
0745

if needed.
@jphelps
@Team_Logistics

I will not be at computer for TALK connection.

1 Like

I sent a Text to @TBJK who has been talking with them on this part of the project the most I belive.

1 Like