These three pieces have been moved to the Needs Attention shelf, located on the top of the far left shelving unit by the kilns. Each has a note addressing what the piece needs before it can be glaze fired. Thank you!
2 Likes
1 Like
Thanks Steve!
1 Like
Glaze unloaded.
As I was uploading files, I realized that I forgot to take a picture of the bottommost half shelf. Most of it was April’s work, but there were a couple of medium-small bowls and other small pieces.
1 Like
In all fairness…i did not load…nor did Steve…they were also small pieces…
1 Like
These pieces have been moved to the Needs Attention shelf, located on the far upper left above the kiln furniture.
These pieces are still there, waiting for their potter’s assistance:
1 Like