Ceramic Kiln News - August 2021

These three pieces have been moved to the Needs Attention shelf, located on the top of the far left shelving unit by the kilns. Each has a note addressing what the piece needs before it can be glaze fired. Thank you! :blush:

2 Likes

Bisque unloaded. The shelves are very full and items are stacked. Please come pick up your pieces

image
image
image
image
image
image

1 Like

Glaze unload




Bisque unloaded




2 Likes

Unloaded glaze




2 Likes

Unloaded the luster from paragon




2 Likes

Thank you @Steve1! :slight_smile:

2 Likes

Unload the bisque from 1027
Uploading: E0763179-6B8D-48DA-A99C-EB61819DB1EF.jpeg…


Loaded bisque in 1027, remaining items

1 Like

Thanks Steve!

1 Like

Bisque shelves are overflowing, please come get your things






Glaze unloaded.



As I was uploading files, I realized that I forgot to take a picture of the bottommost half shelf. Most of it was April’s work, but there were a couple of medium-small bowls and other small pieces.

1 Like

In all fairness…i did not load…nor did Steve…they were also small pieces…

1 Like

These pieces have been moved to the Needs Attention shelf, located on the far upper left above the kiln furniture.


These pieces are still there, waiting for their potter’s assistance:

1 Like

Unloaded glaze





Bisque unloaded…… shelves are full





2 Likes