Please note, we just agreed to hire a Fire Safety Engineer to evaluate the space, define needed changes, and represent us with the Fire Marshall.
We clearly need to replace the current collection system, since it is simply unworkable. The FSE will end up detailing for us the requirements of the new system based on Fire and Building code requirements. An engineer will be required to design and seal the drawings in order to receive the needed building permit.
So there’s no point in getting busy on anything yet. This isn’t going to be a DIY job. Once we know what we need to put in place, we can start looking into controlling the blast gates. But we’re not there yet. We shouldalsobear in mind, we’ve been working with Robert Davidson on his new RFID interloc system as well. So this isn’t a new discussion.
Dave K is currently screening FSE candidates, and we hope to get them hired ASAP.
The best and most important way for members to help out, is to help clean the filters, clean the tools, and keep the shop as immaculate as possible.